Pean to Apollo; Home Solar System Installation & Commissioning
Scope: PV panel installation, mounting, and solar array alignment.
Scope: Assembly and installation of PV combiners and main AC/DC electrical distribution boards.
Scope: Construction & installation of the air-floating enclosure with active ventilation for the Victron MultiPlus-II, MPPT’s and Battery.
Scope: Heavy-duty DC/AC routing, labeling, and cable management.
Scope: Battery bank assembly, safe placement, busbar installation, and main DC connection.
Scope: Cerbo & Energy meter installation, connections, and telemetry programming.
Scope: Firmware updates, ESS (Energy Storage System) assistants configuration, Venus OS programming & VRM.
Scope: Operational system testing, charge/discharge cycle validation, and dynamic load testing.
Scope: Safety measurements, insulation testing, RCD tripping checks, and emergency shutdown validation.
Scope: Pre-commissioning cold checks and the system’s official first powered start-up.
Scope: Final monitoring setup, VRM Portal synchronization, and remote data validation.