Ariadne’s Thread
Cable Routing & Management
← Back to Dashboard
Scope of Work
Heavy-duty DC/AC routing, labeling, and cable management.
Installation Checklist
Lay down high-impact cable conduits and metallic trays.
Pull heavy gauge battery cables (e.g., 50mm² or 70mm²).
Apply heat-shrink tubing and hydraulically crimp heavy-duty lugs.
Tag and label every single conductor at endpoints according to the schematic.
Isolate communication lines (VE.Can, VE.Direct) from high-voltage cables.
Task 6 Description
Task 7 Description
Task 8 Description
Task 9 Description
Task 10 Description
Engineering Notes: I am an amateur handyman and anything I do is under my responsibility. I strongly recommend: Do not try this at home!!!